Posted
July 22, 2009 03:49
by
Robert
Tags:
I realized it's been a while since I posted any exterior pictures, so here are a few with the new front and garage doors now in place. The rough grading is now done and will be complete after the geothermal wells go in. The masons have also done a really nice job on the side retaining wall, which was done with hand cut stones. You can also see the large box on the side of the house for the 400amp service that we need for the Geothermal pumps.
The next two weeks will be fast and furious with updates
as the geothermal wells are installed, finish carpentry is wrapped up,
bathroom tile is finished, and cabinets and hardwood are installed.
Stay tuned.